Tính toán lượng nước tháo khô khi xây dựng khu phức hợp Happy Project trên địa bàn quận Tây Hồ, Hà Nội

Author:

Nguyễn Văn Đản1,Hoàng Văn Duy2,Nguyễn Huy Long3

Affiliation:

1. Hội Địa chất thuỷ văn Việt Nam

2. Liên đoàn Quy hoạch và Điều tra tài nguyên nước miền Bắc

3. Viện Khoa học công nghệ xây dựng

Abstract

Groundwater is unfavorable for construction activities, so groundwater dewatering or freezing needs to be carried out. The Happy complex is located in Tay Ho District, Hanoi city. The complex is to be constructed with 47 stations which are evenly distributed over a construction area of 10,000 m2 in the depth from 12.1 to 18.25 m below the ground surface. It is required to dewater groundwater to have the groundwater level to be 1.5 m lower the bottom of the stations. Vertical groundwater wells have been selected for the. The determination of groundwater pumping rates for the dewatering had been carried out by numerical modeling. GMS10.3.2 software had been used to model the groundwater flow using the MODFLOW modul. The modeling area is expanded to cover the construction site with dimensions of 370m x 420m. The grid cells are 4m x 4m. The groundwater pumping rates were determined by solving forward analysis of different options to select the optimal solution, which includes 29 pumping wells with the same well pumping rate of 1,040 m3/day. The lowered groundwater levels at all the construction stations have met the requirement.

Publisher

Vietnam Institute for Building Science and Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3