Abstract
Cycle times at workstations in offsite construction factories fluctuate widely due to various influencing factors. Consequently, relying on average rates, such as length per unit of time, for estimating cycle times proves to be inaccurate, often leading to significant deviations between production schedules and actual operations. To address this issue, this study proposes an estimation system that leverages machine-learning-based prediction, statistical methods, 3D simulation, and computer vision to predict cycle times at the workstation level. Testing of the system on a semi-automated wood-wall framing workstation in a panelized construction factory shows that it reduces the mean absolute error and sum of errors by approximately 36% and 68%, respectively, compared to the fixed rate method. The results also highlight the efficacy of using computer vision data for training machine-learning models for cycle time estimation, the importance of identifying and understanding the factors influencing cycle times, and the impact of random delays on the accuracy of cycle time estimation systems.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献