Abstract
On the analyzed section of 2.4 km of the national road No. 50 of the Młodzieszyn bypass, it was carried out by a consortium of OAT and SAT companies in the period April-September 2019, under constant traffic in the field of repairing the concrete pavement by replacing slabs, levelling them and sealing expansion joints, roughening and roadside reinforcements.
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献