Abstract
Abstract
The roof support, especially the ŁP yielding steel arch support, is transported and assembled in the face with the use of auxiliary machines. This activity in Polish underground mines causes numerous problems, which until present have not been solved. Currently, transport and assembly are carried out manually, while the roadheader and suspended rail are used only to a small extent. Therefore, the modular installation and transport assembly was developed jointly by FAMA Sp. z o. o. and AGH University of Science and Technology. The solution in question enables performing a number of functions (including transport and assembly of all kinds of support arches), which are not available in currently manufactured equipment. The proposed manipulator solves numerous problems occurring during the installation of the steel arch support in an underground mining excavation and significantly improves the process of drilling galleries. This innovative solution considerably differs from the existing ones, and its greatest advantage is versatility with regard to the cross-section and equipment of the roadway, as well as a wide range of functions. In addition, it can also be used for reloading works. The modular installation and transport assembly together with a platform, a temporary mechanized roof support and a mining machine, make up a mechanizes roadheader complex, which enables continuous mining, loading and installing the permanent support in underground workings.
Subject
General Chemical Engineering
Reference14 articles.
1. Ajamzadeh M.R., Sarfarazi V., Dehghani H. (2019). Evaluation of plow system performance in long-wall mining method using particle flow code. International Journal of Coal Science & Technology, 6, pp. 518-535.
2. Bednarek Ł., Majcherczyk T. (2020). An analysis of rock mass characteristics which influence the choice of support. Geomechanics and Engineering, 21 (4), pp. 371-377.
3. Biały W. (2016). Determination of workloads in cutting head of longwall tumble heading machine. Management Systems in Production Engineering, 21 (1), pp. 45-54.
4. Cao R., Cao P., Lin H. (2016). Support technology of deep roadway under high stress and its application. Int. J. Mining Sci. Technol. 26 (5), pp. 787-793.
5. Dyczko A., Malec M., Prostański D. (2020). The efficiency of longwall systems in the case of using different cutting technologies in the LW Bogdanka. Acta Montanistica Slovaca, 25 (4), pp. 504-516.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献