1. Excess surface work – A modelless way of getting surface energies and specific surface areas directly from sorption isotherms;Adolphs;Applied Surface Science,2007
2. Changes in pore structure and mercury contact angle of hardened cement paste depending on relative humidity;Adolphs;Materials and Structures,2002
3. Standard test method for microscopical determination of parameters of the air-void system in hardened concrete;astm C457D,2009
4. Standard test method for indicating moisture in concrete by the plastic sheet method;Astm D4263,1983
5. Prüfung von Beton – Empfehlungen und Hinweise als Ergänzung zu DIN 1048 (Testing of concrete – recommandations and remarks as addition to DIN 1048);Bunke,1991