1. Akimova, E.N., Gainanov, D.N., Golubev, O.A., et al., The Problem of Scheduling for the Linear Section of a Single-track Railway with Independent Edges Orientations, in 1st Ural Workshop on Parallel, Distributed, and Cloud Computing for Young Scientists. CEUR Workshop Proc., 2015, vol. 1513, pp. 130–136.
2. Lazarev, A.A., Estimates of Absolute Error and Scheme of Approximate Solutionof the Scheduling Problem, Zh. Vychisl. Mat. Mat. Fiz., 2009, vol. 49, no. 2, pp. 14–34.
3. Lazarev, A.A. and Gafarov, E.R., Transformation of the Network Graph of the Scheduling Problem with Predecession Restriction, Dokl. Ross. Akad. Nauk, 2008, vol. 424, no. 2, pp. 7–9.
4. Gholami, O. and Sotskov, Y.N., Scheduling Algorithm with Controllable Train Speeds and Departure Times to Decrease the Total Train Tardiness, Int. J. Indust. Engen. Comput., 2014, vol. 5, pp. 281–294.
5. Sotskov, Y.N. and Gholami, O., Mixed Graph Model and Algorithms for Parallel-machine Job-shop Scheduling Problems, Int. J. Product. Res., 2015, vol. 8, pp. 1–16.