1. Agbo, S.A., Ahmed, Y.A., Yahaya, J., & Ewa, I.O.B., (2016). Analysis of Nigeria research reactor-1 (NIRR 1) thermal power calibration methods. Nuclear Engineering and Techn., 48: 673-683.
2. Ahmed, Y.A., Balogun, G.I., Jonah, S.A., Funtua I.I. (2008): the behavior of reactor power and flux resulting from changes in core-coolant temperature for a miniature neutron source reactor, Annals of Nuclear Energy, 35:2417-2419.
3. Ahmed, Y.A., Mansir, I.B., Yusuf, I., Balogun, G.I., and Jonah, S.A. (2011). Effects of Core Excess reactivity and coolant average temperature on maximum operable time of NIRR-1 MNSR. Nuclear engineering and design 241, 1569-1564
4. Ahmed, Y.A., Ewa I.O.B., Umar, I.M., Bezboruah, T., Johri, M. & Akaho ,E.H.K. (2006). The low power miniature neutron source reactors: Design, safety and applications; UNESCO/IAEA/ICTP Publication IC/2006/020. The Abdus Salam International Centre for Theoretical Physics, Trieste, Italy. http://www.ictp.it/pub_off.
5. Bullock, J.B. (1965). Absolute power measurements of the ford nuclear reactor, paper presented at the ANS conference on reactor operating experience Moran (Wy).