Author:
Hu Hui,Tao Yuchun,Zhang Heng,Zhao Yiqi,Lan Youdi,Ge Zhenghui
Abstract
AbstractIn this paper, a 1:21 model experiment was conducted to discuss the dust diffusion efficiency and liner trolley obstruction effect inside the tunnel at − 9% to 9%, the effect of different initial dust concentrations on dust diffusion and liner trolley obstruction effect at 6% slope, and the effect of different return air velocity on dust diffusion at 6% slope, the reliability of the results is verified by computational fluid dynamics simulations. The results show that as the slope of the tunnel changes from 0 to − 9%, the average dust diffusion time decreases by 3.7% at the working face and the dust concentration difference between the front and rear of the trolley is improved by 2.7%. When the slope of the tunnel changes from 0 to − 9%, the average dust diffusion time increases by 7.2% at the working face and the dust concentration difference between the front and rear of the trolley is improved by 17.9%. With each 100 mg/m3 increase in the initial dust concentration, the dust diffusion time at the working face and the tunnel exit increases by 9.15% and 8.17% on average, and the lining trolley obstruction time increases by 23.33 s on average. The dust diffusion times take an average reduction rate of 15.7%, with the increase of return air velocity. The recommended return air velocity is greater than 1 m/s for large slope tunnels. When the slope changes from 0° to 9°, the hindrance rate of slope on dust diffusion is 2.88462%, 8.65385%, and 16.34615% respectively. Dust diffusion efficiency will be reduced as the tunnel slope changes from 0° to 9°, The growth rate of slope on dust diffusion is − 0.96154%, − 2.88462%, and − 6.73077% respectively.
Funder
National Natural Science Foundation of China
High Speed Railway and Natural Science United Foundation of China
General Program of the National Natural Science Foundation of China
Publisher
Springer Science and Business Media LLC
Reference33 articles.
1. Zhang, H., Hao, Z., Zhang, G., Tao, Y. & Wang, L. The cooling effect of high geothermal tunnel construction environment: A case of ice and spray method in an extra-long tunnel. Int. J. Therm. Sci. 178, 107606. https://doi.org/10.1016/j.ijthermalsci.2022.107606 (2022).
2. Tao, Y. et al. A new ventilation system for extra-long railway tunnel construction by using the air cabin relay: A case study on optimization of air cabin parameters length. J. Build. Eng. 45, 103480. https://doi.org/10.1016/j.jobe.2021.103480 (2022).
3. Feng, Z., Tang, Y., Yang, Y. & Zhang, D. The relief degree of land surface in China and its correlation with population distribution. Acta Geogr. Sin. 62(10), 1073–1082 (2007).
4. Ma, W. Construction technology for large slope inclined shaft by three-step slotting method. Railw. Constr. Technol. 03, 98–101 (2018).
5. Mao, S. Key technology for construction ventilation in long and inclined shaft working area of single-line super long railway tunnel. Build. Technol. Dev. 46(07), 16–18 (2019).