AbstractIn this study, a new type of multi-arch tunnel construction method is proposed. This effort is undertaken due to the many disadvantages of the traditional multi-arch tunnel construction method. Furthermore, this method omits the construction of a middle pilot tunnel, and it has the advantages of safety, high efficiency, and being economical. When using the method of continuous arch tunneling without a middle pilot tunnel, the blasting of the first tunnel and the following tunnel has a greater impact on the surrounding rock damage, as well as on the supporting structure of the same cross-section. Therefore, this study uses LS-DYNA finite element software to construct a three-dimensional numerical model. In addition, the perimeter rock damage law and mechanical response characteristics of the supporting structure in the same cross-section of the first tunnel, as well as the following tunnel after blasting without a middle pilot tunnel, are analyzed. At the same time, the results of the study are based on optimizing the blasting program, and these are then applied to the field. Through the results, it is found that, after blasting a continuous arch tunnel without a medial pilot tunnel, the surrounding rock damage in the arch cross-region of the double-arch tunnel (where the arch top and the arch shoulder are more significant) and the effective stress of the supporting structure exceed the strength design value. In addition, the maximum adequate pressure is distributed in the medial diaphragm wall. With the optimized blasting scheme, the range of the peripheral rock damage is reduced by a maximum of 67%, and the effective stress in the supporting structure is reduced by 25.9–64.8%. The research results are of great significance in terms of improving construction safety, economic efficiency, and project quality, as well as in promoting the research and development of new work methods for double-arch tunnels.
Funder
National Natural Science Foundation of China
China Guizhou Province high-level innovative talents
Publisher
Springer Science and Business Media LLC
Reference39 articles.
1. Xie, C., Tao, T. & Rao, J. Time-varying response analysis of surrounding rock construction mechanics of a double-arch tunnel without a middle pilot tunnel and suggestions for tunnel construction. Lithosphere 2022, 6306861. https://doi.org/10.2113/2022/6306861 (2022).
2. Cao, F., Zhang, S. & Ling, T. Analysis of cumulative damage for shared rock in a neighborhood tunnel under cyclic blasting loading using the ultrasonic test. Shock Vib. https://doi.org/10.1155/2020/8810089 (2020).
3. Lu, S. et al. Dynamic response of twin circular unlined tunnels subjected to blasting P waves. Front. Earth Sci. https://doi.org/10.3389/feart.2022.941070 (2022).
4. Ling, T., Li, S., Liu, D. & Liang, S. Blasting damage of tunnel rock mass based on cumulative effect. Rock Mech. Rock Eng. https://doi.org/10.1007/s00603-022-03128-8 (2022).
5. He, L., Wang, M., Li, Y. & Zhong, X. Contrastive analysis of double-arched tunnel design form and small-interval tunnel design form on loess. In International Conference on Railway Engineering (2014).