Calculation of Cost Estimation Based on Building Information Modeling in Construction Projects

Author:

Mahendra Muhamad Yusuf,Kartika Nia,Tahadjuddin

Abstract

BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.

Publisher

Universitas Pendidikan Ganesha

Reference27 articles.

1. Agustapraja, H. R., & Affandy, N. A. (2017). Perbandingan Estimasi Anggaran Biaya Dengan Metode Sni Dan Bow Pada Proyek Pembangunan Gedung D Fakultas Agama Islam Universitas Islam Lamongan. U Karst, 1(2), 84–93. https://doi.org/10.30737/u karst.v1i2.263.

2. Anjani, A., Bayzoni, B., Husni, H. R., & Niken, C. (2022). Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Peguruan Tinggi Negeri (RSPTN) Universitas Lampung. Jurnal Rekayasa Sipil Dan Desain (JRSDD), 10(1). Retrieved from http://journal.eng.unila.ac.id/index.php/jrsdd/article/view/2360.

3. Danny Laorent, Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1). https://doi.org/10.9744/duts.6.1.1-8.

4. Dewi, A. A. D. P., Yana, A. A. G. A., & Susilawati, N. K. (2019). Analisis Faktor Yang Mempengaruhi Terjadinya Kerugian Negara Pada Tahap Pengadaan Pekerjaan Jasa Konstruksi. Jurnal Ilmiah Teknik Sipil, 23(2). https://doi.org/10.24843/JITS.2019.v23.i02.p04.

5. Haider. (2020). Cost Comparison of a Building Project by Manual and BIM. Civil Engineering Journal, 6(1). https://doi.org/10.28991/cej-2020- 03091451.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3