Mahendra Muhamad Yusuf,Kartika Nia,Tahadjuddin
Abstract
BIM (Building Information Modeling) is currently a concept that can include important information in planning. This study aims Kosmetika Global Helath Indonesia, Ejip Area, Cikarang. In this research, 3D modeling of steel structures was carried out based on shop drawing documents from the research location. Next, calculate the quantity take-off for the estimated cost of steel structure work using Autodesk Revit software. It can be concluded that using Auusingit software can optimize the 2D modeling process into the 3D form so that the quantity take-off calculations can be more detailed and accurate and reduce material waste. It also already supports BIM 5D to help calculate estimated costs. The results of calculating estimated costs using Autodesk Revit software are 3.45% smaller than conventional calculations. It is because conventional methods are calculated manually based on 2D images, which allow for differences due to lack of detail.
Publisher
Universitas Pendidikan Ganesha
Reference27 articles.
1. Agustapraja, H. R., & Affandy, N. A. (2017). Perbandingan Estimasi Anggaran Biaya Dengan Metode Sni Dan Bow Pada Proyek Pembangunan Gedung D Fakultas Agama Islam Universitas Islam Lamongan. U Karst, 1(2), 84–93. https://doi.org/10.30737/u karst.v1i2.263.
2. Anjani, A., Bayzoni, B., Husni, H. R., & Niken, C. (2022). Penerapan Building Information Modeling (BIM) Menggunakan Software Autodesk Revit Pada Gedung 4 Rumah Sakit Pendidikan Peguruan Tinggi Negeri (RSPTN) Universitas Lampung. Jurnal Rekayasa Sipil Dan Desain (JRSDD), 10(1). Retrieved from http://journal.eng.unila.ac.id/index.php/jrsdd/article/view/2360.
3. Danny Laorent, Nugraha, P., & Budiman, J. (2019). Analisa Quantity Take-Off Dengan Menggunakan Autodesk Revit. Dimensi Utama Teknik Sipil, 6(1). https://doi.org/10.9744/duts.6.1.1-8.
4. Dewi, A. A. D. P., Yana, A. A. G. A., & Susilawati, N. K. (2019). Analisis Faktor Yang Mempengaruhi Terjadinya Kerugian Negara Pada Tahap Pengadaan Pekerjaan Jasa Konstruksi. Jurnal Ilmiah Teknik Sipil, 23(2). https://doi.org/10.24843/JITS.2019.v23.i02.p04.
5. Haider. (2020). Cost Comparison of a Building Project by Manual and BIM. Civil Engineering Journal, 6(1). https://doi.org/10.28991/cej-2020- 03091451.