1. Components of the Maximum Levels of Unregulated Prices. JSC “Administrator of the Trading System”. 2002–2023. Available at: https://www.atsenergo.ru/results/market/svnc. (accessed 01 November 2023) (in Russian).
2. Peak Hours. JSC “Administrator of the Trading System”. 2002–2023. Available at: https://www.atsenergo.ru/results/market/calcfacthour (accessed 01 November 2023) (in Russian).
3. Saitov S R., Karachurin B R., Sidorov M. V. (2022) Forecasting Electricity Consumption Peak Hours of Energy Supply Company Included in the Registry of Public Corporation ATSENERGO. Vestnik Kazanskogo Gosudarstvennogo Energeticheskogo Universiteta = Kazan State Power Engineering University Bulletin, 14 (4), 59–68 (in Russian).
4. Voronin V. A., Nepsha F. S. (2023) Forecasting Peak Load Hours of Regional Power Systems Using Naive Models. Smart Electrical Engineering, (3), 111–124. https://doi.org/10.46960/2658-6754_2023_3_111 (in Russian).
5. Maryasin O., Lukashov A., Smirnov N. (2022) Market Electricity Prices and Peak Load Hours Forecasting for a Region of the Russian Federation. Upravlenie Bol'shimi Sistemami = Large-Scale Systems Control, 99, 81–113. https://doi.org/10.25728/ubs.2022.99.4 (in Russian).