1. Korotkevich M. A., Berezhnyi A. V. ed. (1984) Optimization of Operational Service of Electric Networks. Minsk, Nauka i tekhnika Publ. 199 (in Russian).
2. Time Rates for Capital, Current Repairs and Maintenance of Substations of 35–500 kV. Vol. 2. Moscow, Informenergo Publ. 212 (in Russian).
3. Kovarsky L. G. (1985) Estimated Bases of Optimization of Repair of the Power Equipment. Leningrad, Energoatomizda Publ., Leningr. Office. 12 (in Russian).
4. Alexandrov O. I., Domnikov S. V., Babochkin V. T., Baro Bandia, Orlova V. P. (1991) Algorithmization of a Problem of Drawing up the Optimum Monthly Schedule of Shutdowns of the Capital Network Equipment of a Power Supply System. Energetika. Proceedings of CIS higher education institutions and power engineering associations, (7), 10–17 (in Russian).
5. Alexandrov O. I. (1993) Formal-and-Functional Model of the Choice of Options for the Expert System ?f Expeditious Consideration of Repair Applications in ASDS EES. Energetika. Proceedings of CIS higher education institutions and power engineering associations, (9–10), 9–17 (in Russian).