Affiliation:
1. Belarusian National Technical University
Abstract
The development and implementation of a digital current measurement element for proper operation during current transformer (CT) magnetic core severe saturation are considered. CT transient performance is often accompanied by primary current transformation to secondary one with great errors. In this case the secondary CT current which is an input signal of the digital measurement element differs from the ideally transformed CT current both in shape and magnitude. This causes impermissible signal settling time at the standard digital measurement element output. As a result, main requirements to the protection devices such as reliability and fast operation are violated, that in some cases makes the high-speed protection device ineffective. To solve this problem, it is proposed to form the output signal of the digital current measurement element in depending on the input signal total harmonic distortion (THD) coefficient value. Moreover, it is worthwhile to form the output signal so that for a low CT saturation conditions this output signal slightly differs from the secondary current RMS value, and for a severe CT saturation conditions it exceeds this value. Digital current measurement element model has been developed and implemented in the MatLab-Simulink environment using the following blocks: a digital filter block responsible for the input signal fundamental frequency component magnitude calculation; a digital filter block responsible for the input signal RMS value calculation; and, also, a standard blocks for basic mathematical calculations needed for proper functioning of the proposed measurement element. The functional testing of the proposed digital current measurement element model was carried out using the signal, that was similar in form to the waveform of the secondary current of the severe saturated CT. The tests that had been performed confirmed that the proposed digital current measurement element in comparison with the standard current measurement element ensures stable functioning and enhanced operation time during transients.
Publisher
Belarusian National Technical University
Subject
Energy Engineering and Power Technology,Nuclear Energy and Engineering,Renewable Energy, Sustainability and the Environment
Reference11 articles.
1. Bagleibter A. I. (2008) Current Transformer in Relay Protection Networks. Counteraction to ?T Saturation of Aperiodic Component of Short-Circuit Current. Novosti Elektrotekhniki [Electrical Engineering News], 53 (5) (in Russian).
2. Cosse R. E., Dunn D. G., Spiewak R. M. (2005) CT Saturation Calculations: are they Applicable in the Modern World? Part I: The Question. IEEE Transactions on Industry Applications, 45 (2), 444–452. https://doi.org/10.1109/tia.2006.890023.
3. Benmouyal G., Zocholl S. E. (2002) The Impact of High Fault Current and CT Rating Limits on Overcurrent Protection. Proceedings of the 29th Annual Western Protective Relay Conference. Spokane, WA. 2002.
4. Benmouyal G., Zocholl S. E., Guzman-Casillas A. (2004) Instantaneous Overcurrent Element for Heavily Saturated Current in a Power System. Pat. US US6757146 B2.
5. Schweitzer E. O., Hou D. (1992) Filtering for Protective Relays. IEEE WESCANEX 93 Communications, Computers and Power in the Modern Environment – Conference Proceedings. Saskatoon, Canada. 1992. https://doi.org/10.1109/wescan.1993.270548.
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献