Takt production and decentralized decision-making have been recent areas of interest in (lean) construction management research. Both have the potential to improve flow and contribute to increased production performance. Despite the interest, the efforts toward decentralization have not effectively considered the first-line workers; simultaneously, takt production studies suggest that neglection of workers’ involvement has led to implementation challenges and hampered flow. Thus, combining decentralized decision-making (including the involvement of the first-line workers) and takt production could have the potential for further improving production flow and performance. By utilizing design science research, this explorative single-case study aimed to evaluate the effect of decentralized decision-making and takt production to production flow through formulating, implementing, and validating a decentralized takt production framework. The primary data were collected from three production planning sessions and 17 semi-structured interviews, supported by site observations, resource tracking data, schedule data, cost data, and production progress reports. The framework formulation and validation were also supported by six expert workshops. The findings indicate that decentralization can be combined with takt production, aiding production flow. Good operations flow was especially aided by decentralized decision-making. These positive effects were supported by observations of improved utilization of site teams’ knowledge in planning, better commitment, communication, team-building process, and positive competition between teams. In addition, 23% duration savings were achieved in the production phase in which the framework was implemented. Also, stable resource utilization of trades was achieved. The decentralized decision-making practices were successfully implemented in the planning phase; however, the elements of decentralization were not adequately utilized in the control phase, resulting in the intended benefits not being obtained to their full potential magnitude. An extensive effort over single projects and organizations would be needed to gain all the intended benefits, while the competence to successfully operate with (decentralized) takt production increases with experience. The study makes scientific and managerial contributions to improving construction production planning and control practices and flow by exploring the combination of decentralized decision-making and takt production and by considering site teams and first-line workers’ viewpoints, which have been scarce in previous research.

Publisher

Frontiers Media SA

Subject

Urban Studies,Building and Construction,Geography, Planning and Development

Reference68 articles.

1. Automated generation of work spaces required by construction activities;Akinci;J. Constr. Eng. Manag.,2002

2. Can a takt plan ever survive beyond the first contact with the trades on site?;Alhava;in 27th Annual conference of the international group for lean construction (IGLC),2019

3. The extent of team integration within construction projects;Baiden;Int. J. Proj. Manag.,2006

4. 2020 current process benchmark for the Last Planner(R) system BallardG. TommeleinI. 2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3