Author:
Cao Ying,Li Mingrui,Zuo Jianping
Abstract
In order to realize the goal of “building up mobile homestays among lucid waters and lush mountains”, the Mentougou District of Beijing wants to plan the surrounding area with the theme of “One Line and Four Mines” in the west of Beijing. In order to comply with the requirement of “one station, one scene”, 12 railway stations need to be planned and developed in different directions, So the station development needs to be evaluated and analyzed first. In this study, the entropy weight method and the TOPSIS (technique for order preference by similarity to an ideal solution) method are comprehensively used to establish indicators from five aspects: natural potential, mining heritage potential, social potential, traffic potential and tourism potential, and to evaluate the development decision of 12 railway stations of the Menda Railway. The tourism development direction and development importance of abandoned railway stations are decided from the horizontal and vertical dimensions, and the results of the TOPSIS model are expanded beyond the numerical value itself. On this basis, this study also combined with the existing situation of each site, and gave suggestions on the development planning of each site.
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction
Reference26 articles.
1. The Construction Course of the Jingmen Railway;Li;Beijing Arch.,2017
2. Mentougou District Held a Special Meeting on Conceptual Planning Task Book of “One Line and Four Mines” and Its Surrounding Areas in Beijing West [EB/OL] 23 October 2020;Beijing West Times
3. Subject–object perceptions of heritage: a framework for the study of contrasting railway heritage regeneration strategies
4. The application of point-axis system theory in tourism development in northwest China;Shi;Geogr. Inf. Sci.,2003
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献