Abstract
The Peace Dam is one of two flood control dams in South Korea. Located near the demilitarized zone (DMZ) between North and South Korea, the Peace Dam was constructed as a counter measure to the Imnam Dam of North Korea. However, the recent reconciliation efforts between North and South Korea have raised the possibility for the redevelopment of the Peace Dam to be a multi-purpose dam. This study evaluates the possible increase of the flood control ability of the Peace Dam under the condition of its redevelopment. The allocation of flood control and water conservation storage as well as the reservoir operation method is determined to follow the other similar-sized dams in Korea. The flood control ability is quantified by introducing the concept of a storage coefficient. In order to estimate the storage coefficient, an exponential nonlinear reservoir model was used. The results can be summarized as follows: First, the current Peace Dam, a flood control dam, is found to have a small flood control ability. Quantified by the storage coefficient, the flood control ability of the current Peace Dam is estimated to be just 3.9 h. Second, the maximum storage coefficient of the Peace Dam can be increased up to 22.6 h. Here, it is assumed that the dam is operated by the rigid reservoir operation method (rigid ROM) in which the discharge is determined by applying a constant rate (specifically, 0.5 in this study) to the inflow until the peak inflow is reached. In addition, this result is based on the assumption that the ratio between water conservation storage and flood control storage is three. That is, even though the flood control storage is set at just 25% of the total storage, the storage coefficient is increased to be more than five times that of the current Peace Dam. In addition, secured water conservation storage can significantly increase the benefits associated with the redevelopment of the Peace Dam.
Subject
Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry
Reference24 articles.
1. Detailed Design of the PEACE Dam Construction Project (Phase II),2003
2. Survey Report of the Han River Basin II-1: General State of Present Condition,2004
3. Practice Manual for Dam Operations,2009
4. Applying Game Theory for Strategy Transboundary River : the case of Han River in North and South Koreans
5. Comparison of recreation use values among alternative reservoir water level management scenarios
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献