Active Power Control to Mitigate Frequency Deviations in Large-Scale Grid-Connected PV System Using Grid-Forming Single-Stage Inverters

Author:

Al-Shetwi Ali Q.ORCID,Issa Walid K.,Aqeil Raed F.,Ustun Taha SelimORCID,Al-Masri Hussein M. K.ORCID,Alzaareer Khaled,Abdolrasol Maher G. M.ORCID,Abdullah Majid A.

Abstract

Over the last few years, the number of grid-connected photovoltaic systems (GCPVS) has expanded substantially. The increase in GCPVS integration may lead to operational issues for the grid. Thus, modern GCPVS control mechanisms should be used to improve grid efficiency, reliability, and stability. In terms of frequency stability, conventional generating units usually have a governor control that regulates the primary load frequency in cases of imbalance situations. This control should be activated immediately to avoid a significant frequency variation. Recently, renewable distribution generators such as PV power plants (PVPPs) are steadily replacing conventional generators. However, these generators do not contribute to system inertia or frequency stability. This paper proposes a control strategy for a GCPVS with active power control (APC) to support the grid and frequency stability. The APC enables the PVPP to withstand grid disturbances and maintain frequency within a normal range. As a result, PVPP is forced to behave similar to traditional power plants to achieve frequency steadiness stability. Frequency stability can be achieved by reducing the active power output fed into the grid as the frequency increases. Additionally, to maintain power balance on both sides of the inverter, the PV system will produce the maximum amount of active power achievable based on the frequency deviation and the grid inverter’s rating by working in two modes: normal and APC (disturbance). In this study, a large-scale PVPP linked to the utility grid at the MV level was modeled in MATLAB/Simulink with a nominal rated peak output of 2000 kW. Analyses of the suggested PVPP’s dynamic response under various frequency disturbances were performed. In this context, the developed control reduced active power by 4%, 24%, and 44% when the frequency climbed to 50.3 Hz, 50.8 Hz, and 51.3 Hz, respectively, and so stabilized the frequency in the normal range, according to grid-code requirements. However, if the frequency exceeds 51.5 Hz or falls below 47.5 Hz, the PVPP disconnects from the grid for safety reasons. Additionally, the APC forced the PVPP to feed the grid with its full capacity generated (2000 kW) at normal frequency. In sum, the large-scale PVPP is connected to the electrical grid provided with APC capability has been built. The system’s capability to safely ride through frequency deviations during grid disturbances and resume initial conditions was achieved and improved. The simulation results show that the given APC is effective, dependable, and suitable for deployment in GCPVS.

Publisher

MDPI AG

Subject

Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)

Cited by 21 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3