Abstract
Aiming at the design of a project transaction mode, the case-based reasoning (CBR) method is used as a methodology to build a case-based reasoning system based on project performance predictions. Thirty-four cases are initially selected for the practical application. Based on the classical CBR, the performance forecast is added, an improved continuous variable interpolation scoring method is proposed, and three types of manual revision methods are proposed: owner’s preference for the project transaction mode, extreme value, and secondary learning. The innovative method is verified with Nanjing HF Project as an example, and the results show that the case-based reasoning system can optimize the selection and design of the project transaction mode, providing a certain guarantee for project performance and facilitating the transfer of construction experience and knowledge within the construction industry.
Funder
National Natural Science Foundation of China
Subject
Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献