Optimization of Cascade Small Hydropower Station Operation in the Jianhe River Basin Using a One-Dimensional Hydrodynamic Model

Author:

Li Ronghui12,Xiao Kaibang12,Lan Jiao12,Cai Liting12,Huang Xusheng3

Affiliation:

1. College of Civil Engineering and Architecture, Guangxi University, Nanning 530004, China

2. Key Laboratory of Disaster Prevention and Structural Safety of the Ministry of Education, College of Civil Engineering and Architecture, Guangxi University, Nanning 530004, China

3. Guangxi Water Conservancy Research Institute, Nanning 530023, China

Abstract

Hydropower development brings benefits in terms of power generation and flood control, but it also has inevitable ecological impacts. These impacts must be considered and addressed in order to ensure sustainable development and minimize harm to the environment. This study utilized the MIKE 11 HD modeling system to construct a hydrological and hydrodynamic model of the Jianhe River basin. The model incorporates the flow demand of ecologically sensitive targets for scheduling purposes and was calibrated and validated using hydrological data from 2014 to 2022. The hydrodynamic model was then applied to analyze the evolution characteristics of the water level in the main stream of the Jianhe River, identify key areas and periods for hydropower station operation, and calculate the minimum ecological water requirement using verification and estimation methods. Based on these findings, an ecological dispatching scheme for the cascade hydropower stations in the Jianhe River basin was developed. The results demonstrate satisfactory performance of the constructed NAM model for rainfall runoff and the 1D hydrodynamic MIKE 11 HD model for the Jianhe River basin. The deterministic coefficients exceed 0.8, and the relative errors in the total water volume are below 5.5%. The critical time and space interval for hydropower station operation in the main stream of the Jianhe River is identified as December to February of the following year, with the highest risk of flow interruption occurring in January, primarily concentrated between the Duoluo II and Huahai hydropower stations. If the appropriate dispatching scheme is not implemented in the areas prone to flow interruption during critical periods, it will have a negative impact on the ecological environment. These findings provide a scientific basis and decision support for developing multi-objective ecological flow guarantee schemes for rivers.

Funder

National Natural Science Foundation of China

Publisher

MDPI AG

Subject

Management, Monitoring, Policy and Law,Renewable Energy, Sustainability and the Environment,Geography, Planning and Development,Building and Construction

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3