Abstract
Infrastructure projects are usually complicated, expensive, long-term mega projects; accordingly, they are the type of projects that most need optimization in the design, construction and operation stages. A great deal of earlier research was carried out to optimize the performance of infrastructure projects using traditional management techniques. Recently, artificial intelligence (AI) techniques were implemented in infrastructure projects to improve their performance and efficiency due to their ability to deal with fuzzy, incomplete, inaccurate and distorted data. The aim of this research is to collect, classify, analyze and review all of the available previous research related to implementing AI techniques in infrastructure projects to figure out the gaps in the previous studies and the recent trends in this research area. A total of 159 studies were collected since the beginning of the 1990s until the end of 2021. This database was classified based on publishing date, infrastructure subject and the used AI technique. The results of this study show that implementing AI techniques in infrastructure projects is rapidly increasing. They also indicate that transportation is the first and the most AI-using project and that both artificial neural networks (ANN) and particle swarm optimization (PSO) are the most implemented techniques in infrastructure projects. Finally, the study presented some opportunities for farther research, especially in natural gas projects.
Subject
Computer Science Applications,Geotechnical Engineering and Engineering Geology,General Materials Science,Building and Construction,Civil and Structural Engineering
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献