Abstract
Inspection data can be used to comprehend and plan effective maintenance of bridges. In particular, the year of initial construction is one of the most important criteria for formulating maintenance plans, making budget allocations, and estimating soundness. In an initial survey of bridges in Cambodia, it was concluded that the year of construction of only 54% of 2439 bridges surveyed is known, with the remaining 46% remaining unknown. In this research, Landsat satellite data is used to estimate the year of construction of these bridges. Landsat provides spatial spectral reflectance information covering more than 30 years, and for longer bridges this can be used to estimate the year of construction by visual judgement. However, limited image resolution means this is not possible for shorter bridges. Instead, a method using the Landsat Normalized Difference Water Index (NDWI) is used to estimate the year of construction. Three pixels are selected from Landsat image data in such a way that one lies on the current location of a bridge and two other reference pixels are placed on similar terrain at a certain distance perpendicular to the bridge axis. NDWI values are plotted over time for the three pixels and the difference in value between the bridge pixel and the two reference pixels is then compared. Before the bridge is constructed, all three pixels should have similar NDWI values, but after construction the value of the target bridge pixel should differ from the other two because the NDWI value of a bridge surface is different from that of the surrounding vegetation. By looking for this change, the year of construction of a bridge can be estimated. All the bridges in the Cambodian database are classified into three categories based on length (which affects their visibility in Landsat images) and year of construction is estimated. The results show that estimated year of construction has the same accuracy in all three categories.
Subject
Computer Science Applications,Geotechnical Engineering and Engineering Geology,General Materials Science,Building and Construction,Civil and Structural Engineering
Reference35 articles.
1. Bridge safety is not for granted—A novel approach to bridge management;Pregnolato;Eng. Struct.,2019
2. Jiang, Y. (1990). The Development of Performance Prediction and Optimization Models for Bridge Management Systems. [Ph.D. Thesis, Purdue University].
3. Bridge service life prediction model using the Markov chain;Jiang;Transp. Res. Record,1989
4. Deterioration Rates of Typical Bridge Elements in New York;Agrawal;J. Bridg. Eng.,2010
5. Comparison of Methodologies to Predict Bridge Deterioration;Bulusu;Transp. Res. Rec. J. Transp. Res. Board,1997
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献