To address the severity of the wind and light abandonment problem and the economics of hydrogen energy production and operation, this paper explores the problem of multi-cycle resource allocation optimization of hydrogen storage systems for coal–wind–solar power generation. In view of the seriousness of the problem of abandoning wind and photovoltaic power and the economy of hydrogen production and operation, the node selection and scale setting issues for hydrogen production and storage, as well as decision-making problems such as the capacity of new transmission lines and new pipelines and route planning, are studied. This research takes the satisfaction of energy supply as the basic constraint and constructs a multi-cycle resource allocation optimization model for an integrated energy system, aiming to achieve the maximum benefit of the whole system. Using data from Inner Mongolia, where wind abandonment and power limitation are severe, and Beijing and Shanxi provinces, where hydrogen demand is high, this paper analyzes the benefits of the hydrogen storage system for coal–wind–solar power generation, and explores the impact of national subsidy policies and technological advances on system economics.
Funder
National Natural Science Foundation of China
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction
Cited by
3 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献