Abstract
In Japan, residents of apartments are generally contracted to receive low voltage electricity from electric utilities. In recent years, there has been an increasing number of high voltage batch power receiving contracts for condominiums. In this research, a high voltage batch receiving contractor introduces a demand–response in a low voltage power receiving contract, which maximizes the profit of a high voltage batch receiving contractor and minimizes the electricity charge of residents by utilizing battery storage, electric vehicles (EV), and heat pumps. A multi-objective optimization algorithm calculates a Pareto solution for the relationship between two objective trade-offs in the MATLAB ® environment.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
21 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献