Abstract
Above-crossing excavations may cause uplift damages on existing shield tunnels. Therefore, to accurately calculate the deformation of shield tunnels is very necessary for geotechnical engineers. At present, the single-sided elastic foundation beam model is usually used in longitudinal deformation calculations for shield tunnels, which overestimates the uplift of deep shield tunnels. Because of the existence of the ground arch, deep shield tunnels are subjected to two-sided foundation reaction forces. Therefore, this paper proposes a partial missing double-sided elastic foundation beam model and the related fourth-order partial differential equations. In this model, the shield tunnel is subjected to double Winkler foundation springs and is simply considered a Euler–Bernoulli beam. A two-stage analysis method is used to solve the problem. First, the vertical unloading stress due to the above-crossing tunnelling at the tunnel location is calculated through Mindlin’s solution. Second, the deformation response of the beam subjected to an unloading stress is calculated by the finite difference method. Two engineering cases are used to verify the research. The results indicate that the proposed model is more accurate than traditional models in predicting the maximum uplift value, which is basically consistent with the observations. Due to the existence of segment staggering, the longitudinal influence range of the calculation by two models is larger than the actual measurement.
Funder
Fundamental Research Funds for the Central Universities
Subject
General Materials Science
Reference27 articles.
1. Deformation analysis for shield tunnel crossing by close range large section passageway;He;Chin. J. Rock Mech. Eng.,2014
2. Results of monitoring at the British Library excavation
3. Interaction between a large-scale triangular excavation and adjacent structures in Shanghai soft clay
4. Analysis of the observed longitudinal settlement of a tunnel caused by an adjacent shield tunneling on top;Chen;China Civ. Eng. J.,2006
5. Novel Excavation and Construction Method of an Underground Highway Tunnel above Operating Metro Tunnels