1. Department of Statistics Malaysia (2022, June 12). Department of Statistics Malaysia, Official Portal, Available online: https://www.dosm.gov.my/v1.
2. Jing, Y., Wakefield, R., Gunarathna, M.A.C., and Weerasinghe, R.P.N. (2022, June 26). Prefabricated Building Integrated Photovoltaics: Cost and Deployment. Royal Institution of Chartered Surveyors (RICS) Research Trust. Available online: https://researchrepository.rmit.edu.au/esploro/outputs/report/Prefabricated-building-integrated-photovoltaics-cost-and-deployment/9921861040801341#details.
3. Nani, G., Mills, A., and Adjei-Kumi, T. (2007). Past, Present, and Future: Inaugural Construction Management and Economics Conference, University of Reading.
4. Construction Industry Development Board (CIDB) (2018). Malaysian Civil Engineering Standard Method of Measurement (MyCESMM2).
5. Key knowledge generation the importance of standard method of measurement in Indonesian construction industry;Hansen;Int. J. Technol. Eng. Stud.,2015