Risk Analysis and Simulation of Large Bridge Construction Based on System Dynamics

Author:

Fu Xu1,Yang Meng1,Liu Huanqin1ORCID,Wang Lintai1,Li Qian1

Affiliation:

1. College of Architectural Engineering, North China Institute of Aerospace Engineering, Langfang 065000, China

Abstract

To reduce risk incidents in large bridge construction, it is necessary to study the interaction mechanisms and dynamic changes among various risk factors during the construction of large bridges. First, the evolution mechanism of construction risks for large bridges is analyzed, and a risk factor structure system is established. Then, based on system dynamics theory, a causal loop diagram and flow–stock diagram are constructed, and system dynamics equations for each variable in the flow diagram are established to build a system dynamics model. Finally, taking a large bridge construction project as an example, the variable equations are assigned actual values, and the construction risk level is simulated and analyzed. The results show that, ➀ continuous investment in safety funds can effectively reduce the overall risk level of the system, ➁ changes in the management risk subsystem have a significant impact on the overall risk level of large bridge construction, and ➂ increasing the safety investment ratio in both the personnel risk subsystem and the management risk subsystem can effectively reduce the total risk level of the system.

Funder

Hebei Province Construction Technology Research Guide Project

Science and Technology Research Project of Hebei province Higher Education Institutions

Ph.D foundation project of North China Institute of Aerospace Engineering

Langfang City science and technology research and development plan self-financing project

Publisher

MDPI AG

Reference26 articles.

1. Research on the Application of AHP-DEA in Bridge Construction Risk Evaluation;Wang;J. Hebei Univ. Technol.,2014

2. Construction Risk Evaluation of Highway Bridges Based on ANP 2D Cloud Modelling;Li;J. Wuhan Univ. Technol.,2019

3. HSE risk evaluation of cross-sea bridge project construction based on WBS-RBS and AHP;Chen;China Saf. Sci. J.,2013

4. Research on bridge construction risk factors based on factor analysis method;Wang;J. Hunan Univ. Arts Sci. Nat. Sci. Ed.,2018

5. Multi-objective risk analysis and evaluation of bridge construction scheme based on grey hierarchical analysis method;Bao;J. Shenyang Jianzhu Univ. Soc. Sci.,2009

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3