Abstract
A variety of methodological approaches have been developed to performance assessment for the adoption of building information modeling (BIM) at organizational and project levels. Recently, active research has been undertaken on the quantitative analysis of the effects of BIM on projects through BIM-based design validation methodologies. Nevertheless, few studies have addressed the interactions between the BIM staff providing BIM services and the project participants requesting BIM services from the viewpoint of micro-level management. In this study, with the aim of improving the performance of BIM-based construction support, we performed an analysis of the properties of the BIM request for information (RFI) in the construction phase, proposing a method for performance analysis and assessment which considers the competencies of the BIM staff that handle and process such requests. This study verified that, through the application of a priority policy according to the purpose of the information use in the construction phase, the performance of the BIM staff can be improved, and the waiting time of project participants to receive responses to the BIM RFIs can be reduced. The findings of this study are expected to be applied in areas such as decision making on allocation of BIM staff and analysis of return on investment (ROI) in hiring BIM services.
Funder
National Research Foundation of Korea
Subject
Building and Construction,Civil and Structural Engineering,Architecture
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献