Affiliation:
1. School of Architecture and Civil Engineering, Xi’an University of Science and Technology, Xi’an 710054, China
Abstract
With the rapid development of urban rail transportation, people’s demand for subways has gradually manifested itself. The inherent complex attributes of subway project construction determine that subway project construction has a relatively high risk, resulting in huge losses. This paper takes the opportunistic behavior of the subway project as the research object, proposes the opportunistic behavior identification process, and constructs the opportunistic behavior identification model based on the BP neural network. Firstly, through the collection and analysis of subway accident cases, the main forms of opportunistic behavior are summarized, and the primary characteristic indicators for opportunistic behavior recognition are extracted using cluster analysis. Secondly, a recognition model based on a BP neural network is designed. The number of neurons in the input layer, hidden layer, and output layer of the model is determined, and the recognition model is subsequently trained and tested to validate its feasibility. Finally, the constructed opportunistic behavior recognition model is applied to an actual subway construction project, revealing that the construction enterprise of the project in question exhibits a high level of opportunistic behavior risk. Overall, the research results of this paper have important theoretical significance and practical value for the management level of subway project construction enterprises under the new situation and the identification and governance of opportunistic behavior of subway project construction enterprises.
Reference22 articles.
1. Graafland Collusion, reputation damage and interest in codes of conduct: The case of a Dutch construction company;Johan;Bus. Ethics A Eur. Rev.,2004
2. A case study on the identification of opportunistic behaviors in a substitute construction unit;Dai;Manag. Case Stud. Rev.,2019
3. Loss-bearing game modeling based on project managers’ laziness;Liu;Control Decis. Mak.,2009
4. Reanalysis of Engineering Supervision Problems Based on Game Theory;Guo;Sci. Technol. Prog. Countermeas.,2009
5. Contractor’s decision for bid profit reduction within opportunistic bidding behavior of claims recovery;Mohamed;Int. J. Proj. Manag.,2011