Legal Challenges and Public Procurement in Construction in Northern Ireland

Author:

Mitchell Michael1,Agapiou Andrew2

Affiliation:

1. Department of Engineering, Laing O’Rourke Centre for Construction Engineering and Technology, University of Cambridge, Cambridge CB3 0FA, UK

2. Department of Architecture James Weir Building, University of Strathclyde, 75 Montrose Street, Glasgow G1 1XJ, UK

Abstract

Public procurement in the construction sector has been an historic problem in Northern Ireland (NI), to the extent that a public inquiry was held on the matter, including investigating why legal challenge are prevalent, and its findings reported in 2010; a 2019 NI Audit Office report into several major construction projects in NI highlighted legal challenges contributing to project delay, suggesting that perhaps there have not been improvements in relation to legal challenges since the public inquiry. This paper aims to ascertain the frequency of public procurement legal challenges in the construction sector in NI, not just the frequency of court cases, but any challenge to public procurement that delays projects. A multi-phase, mixed methods approach was adopted including a literature review, interviews and questionnaire surveys of procuring and contracting organisations to provide details of all forms of legal challenges, to understand why they challenge procurement decisions and to ascertain views on how public procurement is managed in Northern Ireland. The data reveal that approximately 40 out of 1488 procurement exercises in the last 7 years have had some form of legal challenge. The results also indicate that legal challenges are not as prevalent as the contracting side of the construction industry in NI believes them to be and suggest that the legacy from the public inquiry era around 2008–2012 continues to cloud perceptions of public procurement in NI. The analysis also reveals that the challenging political environment, issues with quality assessment and abnormally low tenders have been the main contributory factors to the rise in legal challenges to public procurement in construction in Northern Ireland.

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference51 articles.

1. Committee for Finance and Personnel (2021, November 02). Report on the Inquiry into Public Procurement in Northern Ireland, Available online: http://www.niassembly.gov.uk/globalassets/documents/committees/2007-2011/finance-and-personnel/reports/public-procurement-in-ni/report-on-the-inquiry-into-public-procurement-in-ni.pdf.

2. McCloskey, J. (2021, September 26). Public Procurement Challenges in Northern Ireland. Available online: www.scl.org.uk.

3. NIAO (2023, February 23). Major Capital Projects, Available online: https://www.niauditoffice.gov.uk/files/niauditoffice/226718%20NIAO%20Major%20Capital%20Projects_FINAL%20LW%20RES%20Complete.pdf.

4. Enhancing value for money in public procurement of Northern Ireland construction projects;McArdle;Proc. Inst. Civ. Eng. Manag. Procure. Law,2018

5. Judiciary, N. (2022, February 21). Judicial Decisions and Directions. Available online: https://www.judiciaryni.uk/judicial-decisions?search_api_views_fulltext=PQQ&action=search.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3