Author:
Bodnár István,Matusz-Kalász Dávid,Boros Rafael Ruben,Lipták Róbert
Abstract
The Hungarian society and the Hungarian state are constantly increasing their solar capacity. More and more solar power plants are being put into operation. The largest of these has a 100 MW peak capacity. Such power plants do not require constant maintenance. However, in the case of low productivity, a conditional assessment is required. The reason for production loss can also be manufacturing, installation, and operational errors. A flying drone was used for finding failures by thermographic scouting. Furthermore, electroluminescent (EL) and flash tests give a comprehensive view of the real state of the modules in a mobile laboratory. We had the opportunity to summarize these test results of more than a thousand modules operating in a solar power plant. The report on the power plant shows that a significant part of the modules became unusable in a short time. After four years, 10% of the 260 Wp modules suffered a performance reduction of more than 10%.
Subject
Materials Chemistry,Surfaces, Coatings and Films,Surfaces and Interfaces
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献