Study on Impoundment Deformation Characteristics and Crack of High Core Rockfill Dam Based on Inversion Parameters

Author:

Pan Litan1,Wu Bo23,Wang Daquan1,Zhou Xiongxiong23ORCID,Wang Lijie1,Zhang Yi4

Affiliation:

1. Huadian Electric Power Research Institute Co., Ltd., Hangzhou 310000, China

2. College of Water Resources and Architectural Engineering, Northwest A & F University, Xianyang 712100, China

3. Key Laboratory of Agricultural Soil and Water Engineering in Arid and Semiarid Areas of Ministry of Education, Northwest A & F University, Xianyang 712100, China

4. Dagu Hydropower Branch of Huadian Xizang Energy Co., Ltd., Shannan 856000, China

Abstract

In the numerical simulation of earth-rock dam, accurate and reliable mechanical parameters of the dam material are the important basis for dam deformation predictions and dam safety evaluations. Based on the deformation monitoring data of Luding core wall rockfill dam, the rheological parameters of rockfill and core wall materials are inverted in this paper. Combined with the actual filling and impoundment process of the dam, the numerical simulation is carried out, and the stress deformation and differential settlement of the dam after completion and impoundment are analyzed. The results showed that the stress deformation results of the dam based on the inversion parameters were in good agreement with the actual deformation. The horizontal displacement, settlement, and principal stress of the dam during the completion period were symmetrically distributed along the core wall. The maximum horizontal displacement occurred at the main dam on both sides of the core wall and the upstream and downstream dam slopes, and the maximum settlement occurred in the middle of the core wall. During the impoundment period, under the action of reservoir water pressure and upstream rockfill wetting deformation, the deformation and stress of the dam body no longer met the symmetrical distribution law, and the maximum horizontal displacement of the dam body during the impoundment period was located at 2/3 of the upstream dam slope. The maximum settlement of the dam body was located at 1/2 of the dam height. The maximum principal stress on the upstream side of the core wall was located on the left side of the bottom of the core wall, and the minimum principal stress was also located on the left side of the bottom of the core wall. The simulation results of the deformation and stress met the general law of earth-rock dam engineering. During the completion period, the deformation inclination of the dam crest was less than 1%. During the impoundment period, the deformation inclination of the dam crest area increased due to the wetting deformation of the upstream rockfill material. At the same time, the deformation inclination of the dam crest axis was larger than that of the upstream and downstream sides, and the deformation inclination of the dam crest at the middle of the valley was the largest, but it did not exceed 3%, that is, there would be no longitudinal cracks, which is consistent with the actual situation. The research results can better predict the stress deformation and crack of the dam body, and provide important support for dam safety evaluations.

Funder

National Natural Science Foundation of China

Fundamental Research Funds for the Central Universities of China

Publisher

MDPI AG

Subject

Water Science and Technology,Aquatic Science,Geography, Planning and Development,Biochemistry

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3