Abstract
During drilling operations, effective displacement of fluids can provide high-quality cementing jobs, ensuring zonal isolation and strong bonding of cement with casing and formation. Poor cement placements due to incomplete mud removal can potentially lead to multiple critical operational problems and serious environmental hazards. Therefore, efficient mud removal and displacement of one fluid by another one is a crucial task that should be designed and optimized properly to guarantee the zonal isolation and integrity of the cement sheath. The present work provides an overview of the research performed on mud removal and cement placement to help the industry achieve better cementing jobs. An extensive number of investigations have been conducted in order to find some key techniques for minimizing the cement contamination and obtaining maximum displacement efficiency. Yet, even after implementing those techniques, the industry happens to encounter poor cementing jobs. The present review aims to assist with evaluating the current theories, methodologies, and practical techniques, in order to possibly identify the research gaps and facilitate the way for further improvements.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference81 articles.
1. Control and Prevention of Inter-Zonal Flow
2. A Study of Completion Practices To Minimize Gas Communication
3. Annular gas flow theory and prevention methods described;Sutton;Oil Gas J.,1984
4. Well Cementing;Nelson,2006
5. Bounding Studies of Cementing Compositions to Pipe and Formations;Evans,1962
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献