Abstract

Due to multiple factors influencing the construction safety of TBM hydraulic tunnels, risk assessment is a critical point of a construction management plan to avoid possible risks. In this paper, a safety-risk evaluation index system of TBM construction for hydraulic tunnels is built based on the identification and analysis of possible sources of risk in techniques, geologic, equipment, management, and accidents. Considering the influence of factors such as the experience level and the expertise of decision makers, a combination assignment method of index weights is proposed based on binary semantics. On the basis of a fuzzy normal distribution used as the subordinate function distribution of fuzzy evaluation levels, the subordinate function distribution of fuzzy evaluation levels under multi-level intersection situations is introduced, and a comprehensive evaluation model of safety risks for TBM tunnel construction is built. The validity and practicality of the evaluation model is examined with the combination of a long-distance water conveyance tunnel project. Results show that the construction safety-risk of the TBM hydraulic tunnel project belongs to the middle-high level, and the safety accident risk belongs to the low level. The study provides guidance of evaluation and control of risks for this tunneling construction being successfully completed.

Funder

Special Joint Research Project of NCWU and Zhengzhou City, Henan, China

Publisher

MDPI AG

Subject

Process Chemistry and Technology,Chemical Engineering (miscellaneous),Bioengineering

Reference44 articles.

1. Trial application of TBM in railroad tunnel construction;Li;China High-Tech Enterp.,2013

2. (2021). Standard for Design of Shield Tunnel Engineering (Standard No. GB/T 51438-2021).

3. TBM performance analysis in pyroclastic rocks: A case history of Karaj water conveyance tunnel;Hassanpour;Rock Mech. Rock Eng.,2010

4. Treatment technology of crossing unfavorable geological tunnel section by double shield TBM at CCS hydropower station water conveyance tunnel;Yang;Resour. Environ. Eng.,2016

5. Statistics and construction methods for deep TBM tunnels with high geostress: A case study of Qinling Tunnel in Hanjiang-Weihe River Diversion Project;Han;Eng. Fail. Analy.,2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3