Author:
Zhou Wenhe,Wang Bin,Wang Meng,Chen Yuying
Abstract
In the remote areas of northern China without central heating and gas supply, for users intending to replace coal-boilers, the air-source heat pump system is always questionable due to the contradiction between its heating capacity and user’s heating demand, especially in very cold areas, whose COP and economy is very poor. The accumulator with phase change materials would be a promising one to solve this problem. With the help of TRNSYS software, a heating system coupled with air-source heat pump, accumulator, and water-source heat pump and its operation mode are provided and analyzed based on the heat source renovation demand of a middle school in Tianshui City suburb which has 5560 m2 area to be heated. The average COP simulated during the heating period of the coupled heating system is 2.23. Based on the simulation model and results, the heat source renovation of the middle school in Tianshui City suburb was carried out, its tested and simulated COP over the day was 2 and 2.05, respectively, which also reveals the validity of the numerical method for this problem.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous),Building and Construction
Reference40 articles.
1. Review of thermal energy storage for air conditioning systems;Abduljalil;Renew Sust. Energ. Rev.,2012
2. Investigation and analysis of the status quo and trend of building energy efficiency in China;Wu;Low Carbon World,2017
3. Achieving better energy-efficient air conditioning – A review of technologies and strategies
4. China Building Energy Research Report 2020;Jiang;Build. Energy Effic.,2021
5. Field test investigation of a double-stage coupled heat pumps heating system for cold regions;Chua;Int. J. Refrig.,2005
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献