Abstract
In this work, we seek to design a model that contributes to the study and resolution of a multi-objective rescheduling problem in dynamic permutation flow shop contexts. In this type of problem, where the objectives can be valued in heterogeneous units, the difficulty of achieving an optimal solution leads to finding a set of non-dominated efficient solutions (also called Pareto front). On the other hand, we will also consider the potential appearance of disruptions in planned scheduling (such as machine breakdowns or arrival of new priority jobs) that require a rapid re-planning of the aforementioned scheduling. In this paper, a hybrid dynamic non-dominated sorting genetic II metaheuristic (HDNSGA-II) is proposed to find the optimal Pareto front. The algorithm is applied to a benchmark already tested in previous studies, defined by three conflicting objective functions (makespan, total weighted tardiness, and stability) and three different types of disruption (machine breakdowns, incorporation of new jobs, and modifications in process times). According to the statistical comparison performed, the HDNSGA-II algorithm performs better in the designed environment, especially in larger problems.
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献