Abstract
The communication infrastructure of the modern Supervisory, Control and Data Acquisition (SCADA) system continues to enlarge, as hybrid High Voltage Direct Current (HVDC)/Alternating Current (AC) networks emerge. A centralized SCADA faces challenges to meet the time requirements of the two different power networks topologies, such as employing the SCADA toolboxes for both grids. This paper presents the modern communication infrastructure and the time requirements of a centralized SCADA for hybrid HVDC/AC network. In addition, a case study of a complete cycle for a unified Weighted Least Squares (WLS) state estimation is tested on a hybrid HVDC/AC transmission network, based on Voltage Source Converter (VSC). The cycle estimates the elapsed times from the sensors up to the SCADA side, including the data acquisition and the WLS processing times. The case study is carried out on the Cigre B4 DC test case network with 43 virtual Remote Terminal Unit (RTU)s installed and 10 data concentrators, all connected through a fiber-based communication network. It is concluded that the time requirements can be fulfilled for a hybrid HVDC/AC network.
Funder
H2020 Marie Skłodowska-Curie Actions
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Reference78 articles.
1. Securing Communication of SCADA Components in Smart Grid Environment;Kim;Int. J. Syst. Appl. Eng. Dev.,2011
2. Power Generation, Operation, and Control;Wood,2012
3. Controlling of Electrical Power System Network by using SCADA;Roy;Int. J. Sci. Eng. Res.,2012
4. Energy Management and Smart Grids
5. Design and implementation of a communication network and operating system for an adaptive integrated hybrid AC/DC microgrid module