Research on Location Selection of Personnel Door and Anemometer Based on FLUENT

Author:

Qin Tao,Zhang Teng,Duan Yanwei,Liu Yongli

Abstract

The structural design of ventilation structures and the arrangement of anemometers in the main ventilation roadway of an underground mine play an important role in the accurate measurement of air speed. It is one of the important tasks of mine ventilation management and intelligent-ventilation-system construction to determine the position of anemometers. In this paper, the CFD numerical simulation method is used to determine the position of the personnel door in the automatic air door by FLUENT software simulating and analyzing the air-speed cloud diagram and air-pressure cloud diagram in the two-dimensional roadway model. Under the same air speed, comparing the air-speed distribution of different cross-sections in the three-dimensional roadway model when the wide door and the personnel door are opened, the anemometer is set at the 25 m cross-section behind the air door, and the air-speed distribution of the cross-section at different air speeds is simulated. The average air-speed line and the specific installation position of the anemometer on the line are obtained by Origin software. The result shows that the position of the personnel door is 400 mm from the middle line of the roadway, and the measurement error of the anemometer is small on the left side of the roadway (0.41, 2.45) and the right side of the roadway (4.59, 2.43) at 25 m behind the air door, which provides a theoretical basis for the measurement of air speed in a coal mine ventilation roadway.

Funder

Central Government for The Reform and Development of Local Universities

Scientific and Technological Key Project of “Revealing the List and Taking Command”

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Mechanical Engineering,Condensed Matter Physics

Reference27 articles.

1. Discussion on the latest technological progress and problems of the intelligent coal mine;Wang;J. Coal Sci. Technol.,2022

2. Principle, key technology and preliminary realization of mine intelligent ventilation;Zhou;J. Coal J.,2020

3. Yang, B., Yao, H.C., and Wang, F. (2022). A Review of Ventilation and Environmental Control of Underground Spaces. Energies, 15.

4. Wu, D.F. (2018). Design and application of mine main fan non-stop reversing system. J. Mech. Manag. Dev., 33.

5. Research and application of modern large-scale mine pneumatic air door;Yang;J. Coal Mine Saf.,2018

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3