Abstract
The purpose of this paper is to apply multistage stochastic programming to the transmission line expansion planning problem, especially when uncertain demand scenarios exist. Since the problem of transmission line expansion planning requires an intensive computational load, dual decomposition is used to decompose the problem into smaller problems. Following this, progressive hedging and proximal bundle methods are used to restore the decomposed solutions to the original problems. Mixed-integer linear programming is involved in the problem to decide where new transmission lines should be constructed or reinforced. However, integer variables in multistage stochastic programming (MSSP) are intractable since integer variables are not restored. Therefore, the branch-and-bound algorithm is applied to multistage stochastic programming methods to force convergence of integer variables.In addition, this paper suggests combining progressive hedging and dual decomposition in stochastic integer programming by sharing penalty parameters. The simulation results tested on the IEEE 30-bus system verify that our combined model sped up the computation and achieved higher accuracy by achieving the minimised cost.
Subject
Energy (miscellaneous),Energy Engineering and Power Technology,Renewable Energy, Sustainability and the Environment,Electrical and Electronic Engineering,Control and Optimization,Engineering (miscellaneous)
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献