Affiliation:
1. School of Computer Science, Shenyang Aerospace University, Shenyang 110136, China
Abstract
In enterprise management, there are often multiple agents competing for the same products to reduce production cost. On this basis, this paper investigates a two-agent slack due-date single-machine scheduling problem with deteriorating jobs, where the processing time of a job is extended as a function of position-dependent workload, resource allocation and a common deterioration rate. The goal is to find the optimal sequence and resource allocation that minimizes the maximal value of earliness, tardiness, and decision variables of one agent subject to an upper bound on cost value of the second agent. Through theoretical analysis, a polynomial time algorithm with O(N3) time is proposed for the problem, where N is the maximum number of jobs between the two agents.
Funder
LiaoNing Revitalization Talents Program
Subject
General Mathematics,Engineering (miscellaneous),Computer Science (miscellaneous)
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献