Abstract
Coal mine construction projects have high risks, and non-compliant designs generated in the design stage will have adverse effects on subsequent construction and production stages. Therefore, it is of great importance to conduct effective preconstruction compliance inspections on coal mine construction designs. To make the compliance check of coal mine building design more rapid and effective, and to reduce the risks arising from the design phase, this study built a compliance inspection system for coal mine building design from the causes of coal mine accidents, using the Word2Vec word similarity calculation method and BIM platform secondary development technology. The system was tested and was found to be able to detect a 92.82% non-compliant component rate where the correct inspection rate was 97.68%. In addition, the inspection time for a single component was only 0.23 s. The construction of the compliance inspection system based on accident causes has changed the extensive inspection mode in the traditional manual model inspection, and the inspection no longer depends on the experience of inspectors, thus improving the efficiency and accuracy of coal mine building model inspection. The inspection focuses on the building elements with high risks, which achieves the purpose of risk control in the design stage.
Funder
The State Key Program of National Social Science Foundation of China
Subject
Health, Toxicology and Mutagenesis,Public Health, Environmental and Occupational Health
Reference37 articles.
1. Experimental study on the mechanical properties and consolidation mechanism of microbial grouted backfill;Deng;Int. J. Min. Sci. Technol.,2022
2. From correlation to causality: Path analysis of accident-causing factors in coal mines from the perspective of human, machinery, environment and management;Fa;Resour. Policy.,2021
3. Research on Safety Production System Integration Model of Coal Mine Construction Project;Zhang;Product. Res.,2011
4. Hotel building design, occupants’ health and performance in response to COVID 19;Bangwal;Int. J. Hosp. Manag.,2022
5. Mechanism of country rock damage and failure in deep shaft excavation under high pore pressure and asymmetric geostress;Liu;Chin. J. Eng.,2020