1. Barrie D. S. and Paulson B. C. (
1992). Professional construction management: Including CM design-construct and general contracting . McGraw-Hill New York 34–35.
2. “DOE tries design-build at lab.” (1999). ENR 242(15; April 19) 16.
3. Eaves W. M. and Laubach P. B. (
1987). Managing hospital design and construction programs . The Foundation of the American College of Healthcare Executives Chicago 73–81.
4. Grattendick J. (
1990). Project delivery approaches: Different options different objectives . American Society for Hospital Engineering of the American Hospital Association Chicago 6–12.
5. Haviland D. (
1988). “Delivery approaches.” Chapter 2.1 The architects handbook of professional practice American Institute of Architects Washington D.C. 9–16 25–26.