1. Duncan J. M. (1988). “Prediction design and performance in geotechnical engineering.” Fifth Australia–New Zealand Conf. on Geomech. Institution of Engineers Australia 1–12.
2. Golder Associates. (1987). “Geotechnical investigation and monitoring Shaw culverts Elgin Road 45 County of Elgin Ontario.” Rep. No. 871-3160 London Ontario July.
3. Golder Associates. (1988). “Monitoring programme Shaw culverts Elign Road 45 County of Elgin Ontario.” Rep. No. 871-3160-1 London Ontario April.
4. The elastic stability of shallow buried tubes
5. Investigation and Assessment of Long-Span Corrugated Steel Plate Culverts