1. Brisson F. (1987). “Knowledge based expert system for planning and monitoring construction projects ” thesis presented to the Massachusetts Institute of Technology at Cambridge Mass. in partial fulfillment of the requirements for the degree of Master of Science.
2. Cherneff J. M. (1988). “Automatic generation of construction schedules from architectural drawings ” thesis presented to the Massachusetts Institute of Technology at Cambridge Mass. in partial fulfillment of the requirements for the degree of Master of Science.
3. CPM Use in Top 400 Construction Firms
4. Garrett J. H. Jr. Basten J. Breslin J. and Andersen T. (1989). “An object oriented model for building design and construction.” Proc. Struct. Congress ASCE 332–341.