Publisher
American Society of Civil Engineers (ASCE)
Subject
Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering
Reference7 articles.
1. Kim J. J. (1995). “A study on the integration of design/cost/schedule information (I).” J. Arch. Inst. of Korea 11(2) 163–171.
2. New Approach for Optimization of Overall Construction Schedule
3. Moder J. J. et al. (
1983). Project management with CPM PERT and precedence diagramming Van Nostrand Reinhold Co. New York.
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献