1. Carr P. (1994). “Reducing highway congestion: creative approach to highway contracting.” Rep. Legislative Commission on Critical Transp. Changes Assembly State of New York Albany N.Y.
2. Clark M. M. (1992). “Innovative contracting practices: what contractors should know.” Transp. Builder (Nov./Dec.) 38–43.
3. Ellis R. D. Jr. and Herbsman Z. J. (1990). “Cost-time bidding concept: an innovative approach.” Transp. Res. Rec. No. 1282 Transp. Res. Board Washington D.C. 89–95.
4. Harp D. W. (1990). “Innovative contracting practices—the new way to undertake public works projects.” Hot Mix Asphalt Technol. (Winter) 6–10.
5. Herbsman Z. J. (1988). “Evaluation of scheduling techniques for highway construction projects.” Transp. Res. Rec. 1156 Transp. Res. Board Washington D.C. 110–118.