Construction Project Cost Escalation Factors

Author:

Shane Jennifer S.1234,Molenaar Keith R.1234,Anderson Stuart1234,Schexnayder Cliff1234

Affiliation:

1. Assistant Professor, Dept. of Civil, Construction, and Environmental Engineering, Iowa State Univ., 498 Town Engineering, Ames, IA 50011 (corresponding author).

2. Associate Professor, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Colorado, UCB 428, Boulder, CO 80302.

3. Professor, Dept. of Civil Engineering, Civil Engineering Lab Building Room 115, Texas A&M Univ., College Station, TX 77843-3136.

4. Eminent Scholar Emeritus, Del E. Webb School of Construction, Arizona State Univ., P.O. Box 6700, Chandler, AZ 85246.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Management Science and Operations Research,Strategy and Management,General Engineering,Industrial relations

Reference50 articles.

1. “$3 200 000 more asked for tunnel.” (1926). New York Times New York February 10 2.

2. Factors Affecting Contractors' Risk of Cost Overburden

3. Anderson S. Molenaar K. and Schexnayder C. (2006). National Cooperative Highway Research Program (NCHRP) Web-Only Document 98: Final Report for NCHRP Report 574: Guidance for Cost Estimation and Management for Highway Projects During Planning Programming and Preconstruction National Cooperative Highway Research Program and Transportation Research Board ⟨http://onlinepubs.trb.org/onlinepubs/nchrp/nchrp_w98.pdf⟩ (Jun. 30 2007).

4. “Asks $28 669 000 for Jersey tube.” (1920). New York Times New York February 15 17.

Cited by 133 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3