1. Probabilistic Simulation Studies for Repetitive Construction Processes
2. Bernold L. E. and Halpin D. W. ( 1984). “Microcomputer cost optimization of earth moving operation.” Proc. 4th Int. Symp. on Org. and Mgmt. of Constr. 11.
3. Chang D. Y. ( 1986). “RESQUE: A resource based simulation system for construction process planning.” PhD dissertation University of Michigan Ann Arbor Mich.
4. “RISIM: Resource-interacted simulation modeling in construction.”;Chua D. K. H.;J. Constr. Engrg. and Mgmt.,2001
5. “Integrated project and process management.”;Dabbas M. A. A.;J. Constr. Engrg. and Mgmt.,1982