Author:
Hartmann Veronika,Lahmer Tom,Smarsly Kay
Subject
Electrical and Electronic Engineering,Atomic and Molecular Physics, and Optics
Reference4 articles.
1. P. Bruckner A. Drexl R. Möhring K. Neumann E. Pesch Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research. 112 (1999), pp. 3-41.
2. V. Hartmann T. Lahmer K. Smarsly Assessment and optimization of the robustness of construction schedules. In: Proceedings of the 22nd EG-ICE Workshop. Eindhoven, The Netherlands, 07/13/2015.
3. J. Kelley M. Walker Critical-Path Planning and Scheduling. In: Proceedings of the Eastern Joint Computer Conference. Boston, MA, USA, 12/01/1959.
4. A. Lova P. Tormos M. Cervantes F. Barber An efficient hybrid genetic algorithm for scheduling projects with resource constraints and multiple execution modes. International Journal of Production Economics, 117 (2009), pp. 302-316.
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献