1. ‘The design and field testing of the Triton tension leg fixed platform and its future applications for petroleum production and processing in deep water’, OTC 2104, Houston (1974).
2. ‘The dynamics of tethered platforms’, RINA Spring Meeting (1977).
3. ‘Compliant Drilling and Production Platforms. Design and construction of offshore structures’, ICE, London (1976).
4. Oceanographical Engineering, Prentice Hall, Englewood Cliffs, N. J., (1964).
5. A new look at the newmark, houbolt and other time stepping formulas. A weighted residual approach