1. (2014)IEEE standard for seismic qualification testing of protective relays and auxiliaries for nuclear facilities.IEEE Std C37.98‐2013 (Revision of IEEE Std C37.98‐1987) pp.1–35.
2. Behrendt K.(2011)Detecting high‐side blown fuse/open‐phase conditions using an SEL‐651R recloser control Schweitzer Engineering Laboratories AG2011‐19 vol. III.
3. Edmund O.Schweitzer I.andKumm J.J.(1997)Detecting high‐side fuse operations using an SEL‐351 relay Schweitzer Engineering Laboratories AG97‐11 vol. III.
4. Rusicior M. Young J. andBurfield A.(2016)Open‐phase detection in the SEL‐751 and SEL‐751A feeder protection relays Schweitzer Engineering Laboratories AG2016‐07 vol. III.
5. Single phase tripping and auto reclosing of transmission lines‐IEEE committee report;IEEE Transactions on Power Delivery,1992